- Click a row, see the element.
- Answer "which elements are missing X?" in three clicks.
Access and edit every parameter
of every element in your open model.
IQ Tools is an interactive spreadsheet inside your Revit model, filterable and editable in place, with no export and no import.
Autoplay, muted, captioned, chaptered — still S1 is the poster frame.
per day
per month
per year
Recovered per coordinator seat, moderate scenario, fourteen workflows, rounded to the nearest hour. Floor: the study. Other roles: pick your row.
An interactive spreadsheet, inside the model.
Edits stage instantly in a local cache; nothing touches the model until you approve the batch in Sync Review, and then it lands as one reviewed transaction — this is separate from Revit's own Synchronize with Central, which you still run afterwards as usual. The grid lists the elements of the open model; linked Revit models are covered in the docs FAQ.
Reads never modify the document; Revit stays responsive.
Model data lives in a local SQLite file on your disk.
Edits are held in the cache and shown as pending.
The exact batch is shown, refusals per cell, and it lands as one atomic transaction.
No Dynamo, no Python, no prompting — every workflow here is a group, sort, filter, fill-down or find-and-replace and faster than coding or prompting AI
A row checked out by a colleague is refused with their name; the rest of the batch still lands.
Explicit, batched and reviewable — a refused cell never blocks the rest of the batch.
Runs as a separate process beside Revit. The deployment brief is published today.
Pick the row that is you.
Hours are the moderate scenario from the time study, net of a 15% review allowance — the study shows the arithmetic and the floor.
- Sheet × revision, as a table in four seconds.
- A 100-sheet metadata update: 1,500 keystrokes becomes 24.
- One seat, no BIM department.
- $50 a month: under one billable hour.
- 193 warnings, 26 kinds, ranked by count in 21 milliseconds.
- Collapse spelling variants a schedule cannot show you.
- One Ctrl+Z reverses a whole batch.
- A seat pays for itself in the first week — the pricing page has the arithmetic.
Fifty small stalls, one lost minute.
Every cell in a Revit schedule is its own transaction — no single one is dramatic, but fifty of them in one task is unavailable time you sit through.
Committing 50 door edits cell-by-cell froze the interface for 9.87 s measured; IQ Tools made the same 50 edits in 0.27 s measured, as one batch, measured live by the Revit API.
Mean native latency 197 ms per transaction; batch, 5.5 ms per element.
Side by side, real time, no cuts. A timer under each half.
Two things you do every week that Revit was not built to do.
"Why can't I see it?" Twelve causes, one answer.
Pick the element and all twelve rules that can hide it are checked at once, with the one that applies marked. In Revit that is six modal dialogs.
Twelve rows, one marked as the cause, the element highlighted in Revit behind it.
Workflow 5 · 12 clicks → 2 · 35.1 s → 4.45 s predicted
Warnings you can sort, count and isolate.
Revit's Warnings dialog has no sort and no count column. Here each kind is a row with its count. Select a warning and its elements select in Revit; zoom to them or isolate them from the same row.
Warnings by kind with counts; one selected; Revit isolated to its elements.
Workflow 12 · 2.5 min → 21 s predicted · census 21 ms measured
These are two of fourteen. Every measured workflow is on the Workflows page; the value census below is a third.
Seven spellings of one value, collapsed to one. A trailing space is pixel-identical in a Revit schedule; the census lists it with a count.
Measured and hardened, and yours to verify.
less physical workload: 1,250 clicks and 679 keystrokes reduced to 73 and 47.
Machine times measured; human times predicted the same way both sides.
Shaped by what broke, on live projects.
IQ Tools went through beta inside a working architectural practice, on live project models, through their actual workflows and deadlines.
Nothing here needs to be taken on trust.
- Pick one live project, two seats: coordinator and documentation technician.
- Time three tasks before and after, stopwatch not opinion.